Fossil Creek as of 11.3.2016 Tunneling will begin soon…
Tunnel bore completedFossil Creek as of 09.07.2016Cutter head exiting the Michigan TunnelGroup shot of all the contractors working on the Michigan Ditch Tunnel Project at Cameron PassRobin with Lithos Engineering explains what the cutter blades will be doing during the tunnelingMichigan Ditch Tunnel Project June 2016Michigan Ditch Tunnel Project near Walden COWill is providing the centerline stakes for tunnel alignmentOn site at the Michigan Ditch Tunnel Project, near Walden , COAcklam on site to assist BT Construction with the launch pit. See Will up on the hill?Bill gathering points in the riverWorking in the field. Taken by Miles.As-built Crews at workAs-builtSummer is coming to an end.Polyline as-built taken by MaxCows!Big spider taken by Max G 09.01.15Praying mantis checking out the Trimble gear. Shot by Max 08.26.15Goats on Quandary taken by WillThis is what our surveyor Will does on his free time. Climbing Quandary 07.12.15Estes park 07.11.2015 taken by MontyCheck him out!
No rain at the Rockies game!This moth dropped by the office and hung around all day. We named it “Henry”. This photo isn’t zoomed, the moth is really that big.While strolling through camp, the elk was caught on camera by one of our surveyors. Taken by Monty.Monument at the top of Bear Peak taken by Scott.High in a tree staring down at the crew, two bald eagles and an eaglet. Taken by Phil.Early morning at the office before heading out to the field. Taken by Phil.Trimble equipment at sunset.Quick shot of a little “field friend” with the new iPhone 6.August afternoon in Weld County
After the storm. Captured by Phil Ibarra, August 2014
Phil and Will staking in the field
Bird on Trimble equipment, taken by Will 05.23.2014