Fossil Creek as of 11.3.2016Tunneling will begin soon… Tunnel bore completed Fossil Creek as of 09.07.2016 Cutter head exiting the Michigan Tunnel Group shot of all the contractors working on the Michigan Ditch Tunnel Project at Cameron Pass Robin with Lithos Engineering explains what the cutter blades will be doing during the tunneling Michigan Ditch Tunnel Project June 2016 Michigan Ditch Tunnel Project near Walden CO Will is providing the centerline stakes for tunnel alignment On site at the Michigan Ditch Tunnel Project, near Walden , CO Acklam on site to assist BT Construction with the launch pit. See Will up on the hill? Bill gathering points in the river Working in the field. Taken by Miles. As-built Crews at work As-built Summer is coming to an end. Polyline as-built taken by Max Cows! Big spider taken by Max G 09.01.15 Praying mantis checking out the Trimble gear. Shot by Max 08.26.15 Goats on Quandary taken by Will This is what our surveyor Will does on his free time. Climbing Quandary 07.12.15 Estes park 07.11.2015 taken by Monty Check him out! No rain at the Rockies game! This moth dropped by the office and hung around all day. We named it “Henry”. This photo isn’t zoomed, the moth is really that big. While strolling through camp, the elk was caught on camera by one of our surveyors. Taken by Monty. Monument at the top of Bear Peak taken by Scott. High in a tree staring down at the crew, two bald eagles and an eaglet. Taken by Phil. Early morning at the office before heading out to the field. Taken by Phil. Trimble equipment at sunset. Quick shot of a little “field friend” with the new iPhone 6. August afternoon in Weld County After the storm. Captured by Phil Ibarra, August 2014 Phil and Will staking in the field Bird on Trimble equipment, taken by Will 05.23.2014 Two eagles resting on a tank battery, 05.21.14